The DPDP penalty schedule is an engineering backlog
Every ceiling in the DPDP penalty Schedule lands on a system you can build. Read it as a backlog, highest ceiling first, and the order of work writes itself.

The Digital Personal Data Protection Act prices non-compliance in fixed rupee ceilings, and every ceiling lands on a system you can build. Read the penalty Schedule as a backlog and the order of work writes itself: the highest ceiling is the first epic. The one-year mark for the Consent Manager provisions passed on 14 November. The remaining obligations, including security safeguards and breach intimation, start 18 months after the Rules were notified on 14 November 2025. That is mid-May 2027, about 25 weeks from today.
The Schedule, as ceilings
One crore is ten million rupees. These are the maximum penalties in the Schedule to the Act:
| Failure | Section | Maximum penalty |
|---|---|---|
| Reasonable security safeguards against a personal data breach | 8(5) | ₹250 crore |
| Notifying the Board and affected people of a breach | 8(6) | ₹200 crore |
| Obligations for children's personal data | 9 | ₹200 crore |
| Additional obligations of a Significant Data Fiduciary | 10 | ₹150 crore |
| Any other provision of the Act or Rules | – | ₹50 crore |
| A Data Principal's own duties | 15 | ₹10,000 |
These are ceilings, not fines. The Data Protection Board sets the amount under section 33 after a hearing and weighs whether the penalty is proportionate and effective. They are also fixed figures, not a percentage of turnover, which makes them easy to put in a risk register and easy to compare against the cost of the controls that prevent them.
Epic one: security safeguards (₹250 crore)
The largest ceiling attaches to the broadest duty, and Rule 6 spells out what "reasonable" means. It lists encryption, obfuscation or masking of personal data; controls on access to the computing resources that hold it; visibility into who accessed the data through logs, monitoring and review; backups that keep processing going; retention of those logs and the personal data for one year; and contract terms with every Data Processor. Each one is a ticket: field-level encryption, role-based access with a quarterly review, an immutable access log, a restore you have tested, a retention job, and processor agreements that match the technical controls. This epic also protects the next two, because a breach you can detect is a breach you can report.
Epic two: breach intimation (₹200 crore)
Rule 7 sets the clock. Each affected person gets notice without delay, in plain language, through their account or registered contact, covering what happened, the likely consequences, what you are doing and what they can do. The Board gets a description without delay and a detailed report within 72 hours of becoming aware of the breach. The engineering is a pipeline: detection that raises an incident, an incident record that captures the facts the report needs, a template for each of the two notices, and a rehearsal that proves the 72 hours is achievable. A runbook that has never been exercised is a document, not a control.
Epic three: children's data (₹200 crore)
If your product serves anyone under 18, section 9 requires verifiable consent from a parent or guardian before processing, and bars tracking, behavioural monitoring and targeted advertising aimed at children. That is an age gate, a parental verification flow, and a data flow audit that removes advertising and behavioural analytics from child accounts. If you have no child users, write that down and prove the gate that keeps it true.
Epic four: Significant Data Fiduciary duties (₹150 crore)
If the government notifies you as a Significant Data Fiduciary, section 10 adds a data protection officer based in India, an independent data auditor and periodic impact assessments. Most companies are not in this tier. The ones that are need the evidence trail from epics one to three before an auditor arrives.
Epic five: everything else (₹50 crore)
The residual tier covers the day-to-day machinery: an itemised notice, consent that is specific and withdrawable as easily as it was given, the rights to access, correction and erasure, grievance handling, and erasing data when its purpose is served. This is the 80 percent of the work that does not appear in the headline numbers, and it is where most of the build hours go. Our earlier build plan covers the consent, withdrawal and rights systems in order.
The order to ship in
- Weeks 1 to 4: map personal data and processors, then close the Rule 6 gaps that are cheapest to close, which are usually access logging, retention and processor contracts.
- Weeks 5 to 9: build the detection-to-notice pipeline for Rule 7 and run one full rehearsal against the 72-hour clock.
- Weeks 10 to 17: consent, withdrawal and data-principal rights, with the children's gate if it applies.
- Weeks 18 to 25: test, remediate and keep the evidence, because the evidence is what you show the Board.
Start by sizing your own exposure with the DPDP penalty calculator. If the gap list reads like a build, a two-week Strategy engagement turns it into a written plan with a number and a window on each epic, and we scope the build fixed-price.
Sources: Schedule to the DPDP Act, 2023 · DPDP Rules 2025, Rule 6 · Rule 7 · Act text on India Code